talk about bad timing

It is official. The airport project has been suspended. Since the project was to be deployed in Libya, I do not need to specify a reason.

It could have been worst, it could have happen in a year and I could have been cut in the middle of it. Now safely home, I just have that empty feeling of what would have been a great challenge. And at the same time i’m feeling cheap when I think that people are getting killed because of their political vue.

So I’m waiting for a new project, and  will see

Mario

About Mario

Consultant en télécommunication et CCIE #7704 depuis plus de 15 ans et totalisant plus de 30 ans d'expérience en TI. Ce blog sera un reflet de mes opinions sur les nouvelles technologies et l'impact de ces dernières sur nos vies Network consultant and CCIE #7704 for more than 15 year with over 30 years in IT, This blog will be my take on technology and the impact on our life suivez moi / Follow me on Twitter , Google Plus , Linkedin
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to talk about bad timing

  1. Izz says:

    Ouin… On l’avait pas vu venir celle-là… Heureuse de te savoir en sol Candadien tout de même! Il y en aura d’autre projets, t’en fais pas!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s